- 1
The brief. Project management, conveyor, milestones and a Gantt chart, written as notes.
- 2
Early explorations. Bars, timelines, and B and BS monograms, most built around a diamond.
- 3
The circled direction. Offset brackets protect the scope and close the handoffs. The diamond is the milestone at the finish line.
How the mark is built
Two offset L brackets frame one diamond. Both brackets have the same line weight. The diamond sits at the point where the two brackets meet in space. The wordmark letterforms are custom, drawn for Bluestem and not set in a font.
What each part stands for
The diamond
The milestone diamond from a Gantt chart. A milestone is a date the whole project agrees on.
The two brackets
They frame the diamond and bridge the gaps between design, vendors, installation and operations.
The name Datum
A datum is the fixed reference point that everything else is measured from.
One mark for your promise: every vendor measured against the same plan.
Color, with a job for each
Seven colors. Each one has a name and a role.
Datum Navy
#132C49
Text, headings, dark bands, the lower bracket
Datum Blue
#1B62A3
Buttons, links, the upper bracket
Milestone Green
#3F923C
Graphics only: the diamond and progress marks
Field Green
#2B6B2D
Status text and small icons
Survey White
#F4F7FA
Page background
Slate
#4A5B70
Secondary text and captions
Sky
#9CC4EC
Links and accents on navy
Milestone Green stays on graphics, never on text. Milestone Green does not pass contrast for body copy.
Type: IBM Plex Sans
IBM Plex Sans for headings, body and tables. The face is plain and readable, and the face sits beside the squared logo without copying the logo. Figures line up in schedules and dates.
Control over scope. Control over execution. Control over results.
| Phase | Start | Finish | Days |
|---|---|---|---|
| Scope and design review | 03 Mar | 28 Mar | 25 |
| Vendor alignment | 31 Mar | 18 Apr | 18 |
| Drawings and schedule | 21 Apr | 23 May | 32 |
| Installation and field coordination | 26 May | 29 Aug | 95 |
| Commissioning and startup | 01 Sep | 26 Sep | 25 |
| Go-live and handover | 29 Sep | 17 Oct | 18 |
Sample figures, set in tabular numerals.
The wordmark is not part of this font. The wordmark stays as drawn.
Four ways to use the logo
Full color
For light pages and documents.
bluestem-datum-horizontal-color.svg
Reversed, green diamond
For navy bands, with the diamond kept green.
bluestem-datum-horizontal-reversed-green.svg
One color, navy
For stamps, forms and single-color print.
bluestem-datum-horizontal-onecolor-navy.svg
Icon
For favicons, profile photos and small spaces.
bluestem-datum-icon-color.svg
The logo in motion
A short branded motion graphic: the brackets draw in and the diamond lands.
Your brand kit
The same mark on six items your team and your clients would hold. These are concept mockups for review, not produced items.
Business card
Navy front with a Gantt hairline that ends in a milestone diamond, and a green painted edge. The back carries your name and site.
Hard hat decal
The full-color logo as a decal on the front of a white hard hat.
Notebooks
A navy notebook with a white foil logo and a green diamond, and an off-white notebook with the full-color logo.
Embroidered quarter-zip
A small white embroidered logo with a green diamond on the left chest.
Stationery set
Letterhead, envelope and card laid out together, each with the same hairline and diamond.
Insulated tumbler
Navy tumbler with the one-color logo.
Visit your website
The site is already live for you to click through
The preview site uses the words from your own article, in your order. You can scroll the home page and open all ten inner pages.
- Eleven pages, one for each service and each audience
- Your article's headings and wording as the page copy
- Your logo, colors and type from step 1
- A contact form that sends you each request and sends the visitor a copy of what they sent
- Photos marked as examples until you send your own
- Pages written so owners, operators and integrators find the firm when they search for your services
Nothing on the preview is final. Send your notes to JT Studio.